Classroom Training: Utility-scale Battery Energy Storage Systems (BESS), Kuala Lumpur, Malaysia, 3 and 4 December 2025

3rd and 4th December 2025

A nice mix of participants this time in the Utility-scale Battery Storage Systems (BESS) training.

I noticed that the mean age of participants is slowly shifting now at the end of about 2 years of offering this training. Before it was a topic of interest for participants under 30 years of age. Now the interest is also starting to develop among more senior engineers and decision makers.

The questions used to centre around ‘What if we had BESS’ to now ‘We know we want BESS, how can we safely do this?’. A nice progression to observe.

No deficit of good and challenging questions here.

Thank you IK Academy for the collaboration.

———-

At Volta Forensic we support power utilities, developers, and regulators in the following areas:

a. Investigating BESS failures and fire incidents

b. Providing independent quality assurance inspection during Type Test, Factory Acceptance Test (FAT) and Site Acceptance Test (SAT), and other testing, inspection and certification type services via our association with KEMA Labs .

c. Advisory support on safe deployment of CESS and large-scale BESS projects.

d. Financial modeling, feasibility studies, specifications review and other consultancy type services via our agency with CESI SpA .

We are optimistic to contribute and see how these discussions will shape upcoming projects and support the wider (and safer) adoption of energy storage in Malaysia and the ASEAN region.

Our latest feed
Reach out to us today

Whether you have questions, need assistance, or just want to explore possible future projects. We are here and happy to connect. Your journey with us starts with a simple message.

© 2023, Volta Engineering and Inspection Sdn. Bhd, 202301036662 (1530585-V), All Rights Reserved