12 – 14 August 2025.
Just concluded a 3-day customized Submarine Power Cables – Design to Deployment training with my former colleagues at TNB Labs Sdn. Bhd.
The program covered the full lifecycle of submarine power cable projects; from system design considerations and manufacturing quality assurance to installation methodologies and post-deployment monitoring.
We explored technical challenges, lessons learned from real-world projects, and practical strategies to ensure reliability and long-term performance in challenging marine environments. The participants’ enthusiasm and technical inquisitiveness made the sessions engaging over the duration of 3 days. Thank you for your dedication to advancing submarine power cable expertise in Malaysia.
———-
At Volta Forensic, we help ASEAN power utilities at different stages of submarine power cable lifecycle — from inspection of installation nonconformities, condition assessment, and failure investigations.
Our independent expertise assists in delivery and operation of both interconnection and island electrification projects.
Through our association with KEMA Labs and Cesi, we are able to support with quality assurance inspections and a range of technical studies and advisory support.